top of page

Building Now? Get the Water Side in the Right Order. 

Once the build starts, things move fast. The plumbing and septic steps have to happen in the right order, and each one has to pass inspection before it gets covered up. Here is how to keep your project on track and avoid paying twice.

​

← Back to the New Build Guide 

The one rule that matters most   

Never cover work before it is inspected.

Pipes under a slab, pipes inside the walls, and the septic system all need an inspector to see them first. If concrete, drywall, or dirt goes over them too soon, the inspector may make you open it back up. That costs time and money you did not plan to spend.

Before any trade covers anything, ask one simple question: has this passed inspection?

​

A common build order

Every project is a little different, and your county may do things in another order. This is a common way it goes:

  1. Clear and grade the lot. Keep heavy equipment off the drainfield area.

  2. Set underground plumbing. On a slab home, pipes under the slab go in first and get inspected before the concrete is poured.

  3. Pour the foundation.

  4. Frame the house.

  5. Rough in the plumbing. Pipes go inside the walls and floors, then get inspected before the walls close.

  6. Install the septic system. The county inspects it before it is covered.

  7. Finish the plumbing. Fixtures, water heater, and the final plumbing inspection.

  8. Final grading and driveway. Still keeping off the drainfield. 

Protect the drainfield area from day one   

The spot where your drainfield will go is the most important patch of ground on your lot. Heavy trucks, dump loads, and piles of dirt can pack the soil down so water cannot soak in the way it should.

Easy ways to protect it:

  • Mark it off with flags or rope before work starts

  • Tell every crew where it is

  • Keep trucks, equipment, and material piles off it

  • Plan where delivery trucks will park

This one step can save you from a drainfield that struggles for years.

​

Get your plumber and septic installer talking

The pipe that leaves your house has to meet the pipe that goes to your septic tank. If they do not line up, someone has to fix it.

Before the foundation goes in, make sure your plumber and septic installer agree on:

  • Where the main sewer pipe leaves the house

  • How deep it will be

  • The path from the house to the tank

A quick call between them now can save a lot of digging later. 

ABOUT DOING YOUR OWN PLUMBING

​

Georgia law lets you do plumbing work in a home you own or live in. The work still has to meet code and pass every local inspection. In Jackson County, plumbing is covered by your building permit.

Plumbing in a new home is a big job, and mistakes hide inside the walls. Many owner builders hire a licensed plumber for this part. When we work on a new build, we bring in a plumber we trust.

​

Upgrades worth adding before the walls close

Some things cost very little to add now and a lot more later:

  • An extra outdoor spigot on the back or side of the house

  • Shutoff valves for each bathroom, so one repair does not shut down the whole house

  • A water line out to a garage, shop, or garden

  • A spot for a water softener or filter if you will be on a well

  • Easy access to your main water shutoff  

MISTAKES THAT COST THE MOST   

  • Pouring a slab before the underground plumbing passes inspection

  • Closing walls before the rough in plumbing passes inspection

  • Covering the septic system before the county inspects it

  • Driving equipment over the drainfield area

  • Letting the plumber and septic installer guess where the sewer pipe goes

  • Changing the floor plan after the septic permit without checking with the health department

​

​

QUESTIONS PEOPLE ASK

​

Who inspects the septic system?

The county health department. They need to see it before it is covered.

​

Can I drive over my drainfield once it is covered?

No. Keep cars, trucks, and heavy equipment off it, during the build and after you move in.

​

When should I call about septic?

Before the foundation goes in. That gives everyone time to line up the sewer pipe and plan around the drainfield. 

HOW WE CAN HELP

We install new septic systems and drainfields, handle grading, and coordinate plumbing through a plumber we trust. We are used to working around other crews on a new build, and we know what the county needs to see before anything gets covered. Every new system we install comes with a one year labor warranty, plus the parts maker's warranty.

​

Ready to schedule septic or plumbing for your build?

Call us at 770-472-7587 or send a quick note. We will help you fit the water side into your schedule.

​

Next step: I need a well | Back to the New Build Guide

​

Rules change and can differ by county and city. Always confirm with your local health and building departments. 