You Have the Land. Now Let's Plan It Right. 

This is the step where a little planning saves a lot of money. Your house, septic, well, and driveway all have to fit together. Then you need the right permits, in the right order. Here is how it works in plain words.

​

← Back to the New Build Guide 

Plan the house and the septic together  

Many people pick a house plan first and think about septic later. That can cause trouble. Your septic system is sized for your home, and the health department uses details like the number of bedrooms to decide how big it needs to be.

​

That means a few things:

  • Settle on your number of bedrooms early

  • A bonus room that could be a bedroom may count as one, so ask

  • If you add a bedroom later, your septic may need to grow too

Where the house sits matters just as much. The drainfield needs good soil, and the best soil on your lot may not be where you pictured the house.

​

Give everything its own space

Georgia has rules about how close certain things can be. Here are a few that shape most layouts:

  • The drainfield must be at least 100 feet from any well or spring

  • The drainfield must be at least 10 feet from water lines and from buildings with basements

  • The septic tank must be at least 15 feet from a drainage ditch or embankment

Your county may have more rules, and your exact site may need more room. The health department will look at your layout during the site visit.

Keep the driveway off the drainfield. Cars and heavy trucks can crush pipes and pack the soil. A driveway route that crosses the drainfield is one of the most common layout mistakes. 

How septic permits work in Jackson County  

In Georgia, a septic system needs a permit from the county health department before it goes in. In Jackson County, that is Jackson County Environmental Health, at 260 Lee Street in Jefferson. Their phone number is 706-367-3643.

​

What they ask for:

  1. A completed Site Evaluation Request form, with a sketch of your layout and building sizes

  2. An original, signed Level 3 soil report from a state certified soil classifier

  3. A copy of the recorded plat, if your lot is not in a recorded subdivision

  4. The four corners of the house staked out before they visit

  5. Fees paid before they visit

Some sites may also need a site plan or a more detailed soil report. The office will tell you if yours does. Incomplete applications are not accepted, so double check everything before you turn it in.

​

After the site visit, if the soil and layout work, the health department issues the permit. Then the system can be installed and inspected. 

SEPTIC FIRST, THEN YOUR BUILDING PERMIT

​

In many places, you need septic approval before you can get a building permit. The City of Jefferson, for example, requires approval from Jackson County Environmental Health first when a home will be on septic.

If you are building inside a city, like Jefferson or Commerce, check with that city's building department. If you are in the county, check with the county.

​

Being your own builder in Georgia

Georgia lets you act as your own general contractor without a license, as long as a few things are true:

  • You own the land

  • The home is for you and your family to live in

  • It is not being built to sell or rent

  • You oversee the work yourself

Your building department will usually ask you to sign a form saying all of this is true. If you sell or rent the home within two years after you get your certificate of occupancy, the law may treat it as built for sale. So plan to live there.

What being your own builder still means:

  • You still need every permit

  • Every inspection still applies

  • You are responsible for making sure the work meets code

  • You cannot hand the job to someone without a license to run it for you 

A SIMPLE PLANNING ORDER  

  1. Get your soil report

  2. Settle your number of bedrooms

  3. Sketch the house, driveway, septic, and well

  4. Turn in your septic site evaluation request

  5. Stake the house corners

  6. Get your septic permit

  7. Sign your owner builder form, if needed

  8. Get your building permit

Your county may do this in a slightly different order, so always ask.

​

​

QUESTIONS PEOPLE ASK

​

Does a bonus room count as a bedroom?

It might. Ask the health department before you finalize your plans, since bedrooms affect your septic size.

​

What if I change my floor plan after I apply?

Tell the health department. Jackson County has a form to ask for a change to your permit application, and a change may need another review.

​

Do I still need inspections if I build it myself?

Yes. Being your own builder does not skip any permit or inspection. 

HOW WE CAN HELP

We handle septic permit work and site prep for new systems. Bring us your lot and your house plans, and we will help you find a layout that works for the house, the septic, and the well. Then we can help with the permit and the install.

​

Have house plans? Let's talk about the septic.

Call us at 770-472-7587 or send a quick note. We are happy to look things over with you.

​